Difference Between Vande Bharat Trains and Amrit Bharat Train

Vande Bharat Express is a semi-high-speed luxury train connecting cities less than 10 hours apart, featuring advanced amenities like GPS-based information systems and bio-vacuum toilets. In contrast, Amrit Bharat Express, designed for migrant labor, operates as a loco-hauled train, offering improved facilities, including mobile chargers and zero-discharge modular toilets. Amrit Bharat focuses on historical routes, with Prime Minister Modi set to inaugurate the service on December 30, marking a milestone in Indian railway infrastructure. The trains showcase distinct configurations, emphasizing speed and efficiency for Vande Bharat and enhanced comfort for Amrit Bharat.

Difference Between Vande Bharat Trains and Amrit Bharat Train

Vande Bharat Express focuses on medium-distance luxury travel, Amrit Bharat Express is designed to cater specifically to the migrant labor force, with a unique “push-pull” setup and improved amenities. Both contribute to India’s railway infrastructure, aiming to enhance the overall travel experience. This table summarizes the key differences between Vande Bharat Express and Amrit Bharat Express.

Aspect Vande Bharat Express Amrit Bharat Express
Overview Medium-distance semi-high-speed luxurious train Designed for migrant labor force
Operated by Indian Railways
Typically 16 AC executive class (EC) and chair car (CC) coaches
Speed  Designed to run at 160 kmph but operates at 130 kmph Maximum speed potential of 130 kmph
Fully electric, 6000 horsepower engine power
Launch and Inauguration To be inaugurated by PM Modi on December 30
Initial routes: Ayodhya to Darbhanga and Bengaluru to Malda
Design and Configuration Typically operates as a trainset with a distributed power system Follows a loco-hauled configuration, “push-pull” setup
 Locomotive WAP5 locomotive at each end
Coach Composition and Amenities 16 AC executive class (EC) and chair car (CC) coaches 22 coaches, including AC and non-AC
Features like GPS-based passenger information system and Improved amenities: mobile chargers, cushioned luggage racks
bio-vacuum toilets Advanced facilities: zero-discharge FRP modular toilets, etc.
Manufacturing  Manufactured at Integral Coach Factory (ICF) in Chennai Manufactured at Integral Coach Factory (ICF) in Chennai
Routes and Connectivity Existing with 34 trains, 16-car and 8-car services Initial routes connecting Ayodhya to Darbhanga and Bengaluru to Malda
Future Improvements No specific mention of future improvements Intention to operate for a trial period of 4-5 months for continuous enhancement
Fare Details Average total fare for an adult in Economy and Premium Classes Base fare planned to be 15% higher than current express trains
Government Targets Initial target of 75 services by August 2024 No specific mention of government targets

Leave a Reply

Your email address will not be published. Required fields are marked *